PPM Setting Schedule RFG Changes Redline - February 2020

19 February 2020

PPM Setting Schedule RFG Changes Redline - February 2020

SONI Grid Code RfG Redline - February 2020

19 February 2020

SONI Grid Code RfG Redline - February 2020

Power Park Module Setting Schedule - February 2020

19 February 2020

Power Park Module Setting Schedule - February 2020

SONI Grid Code - February 2020

19 February 2020

SONI Grid Code - February 2020

SONI Transmission Outage Summary 2020 (Week 08-09)

14 February 2020

Update of planned transmission outages across the Northern Ireland network.

Report on Public Consultation on Transmission Development Plan Northern Ireland

14 February 2020

The Transmission Development Plan Northern Ireland(TDPNI) sets out the transmission projects we are developing or intending to develop for the period of the Plan. It also contains information about the needs and drivers of the projects. The projects are integral to ensuring an adequate transmission network is in place. The TDPNI forms part of SONI’s statutory and licence obligations

Connections Register – 12th February 2020

14 February 2020

The following document provides information on current connections in Northern Ireland which are connected to the Transmission System operated by SONI or have applied for future connection with us. In addition the document also provides information on current connections in Northern Ireland which are connected to the Distribution System, that have entered a TUoS Agreement with SONI or have applied to SONI for a TUoS Agreement. These include Transmission and relevant Distribution connection types as follows: Generation; Demand; AGU; DSU; and Storage.

SONI Transmission Outage Summary 2020 (Week 07-08)

07 February 2020

Update of planned transmission outages across the Northern Ireland network.

LFCBOA for the IE and NI Synchronous Area

07 February 2020

EirGrid TSO & SONI TSO final versions of the Synchronous Area Operational Agreement and the Load Frequency Control Block Operational Agreement (in accordance with Articles 118(2) and 119(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation)

LFCBOA for the IE and NI Synchronous Area

07 February 2020

EirGrid TSO & SONI TSO final versions of the Synchronous Area Operational Agreement and the Load Frequency Control Block Operational Agreement (in accordance with Articles 118(2) and 119(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation)