System Margins Outlook Report 06.03

06 March 2023

The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.

System Margins Outlook Report 03.03

03 March 2023

The System Margins Outlook Report will be published every Monday and Friday, excluding bank holidays. The report will provide market participants with information on the anticipated availability of dispatchable generation capacity to meet peak demand each day over the week ahead; the average and lower confidence renewables forecast; and the availability of the East-West Interconnector and the Moyle Interconnector with Great Britain to support trades - should these be required to meet power system requirements when renewable and dispatchable generation are inadequate.

Transmission Interface Arrangements-Route alignment and site locations

03 March 2023

Transmission Interface Arrangements-Route alignment and site locations v1

Transmission Interface Arrangements-Route corridors

03 March 2023

Transmission Interface Arrangements-Route corridors v1

Transmission Interface Arrangements-Option appraisal

03 March 2023

Transmission Interface Arrangements-Option appraisal v1

TIA schedule- Feb 2023

03 March 2023

Transmission Interface Arrangements

03 March 2023

Latest version of the Transmission Interface Arrangements